Major Milestones
Reached 500 Million feet (150 Million meters) of pipe inspected by over 2000 utilities. Control box cushions released.
A central source for insights, tools, and updates on acoustic sewer inspection technology, wastewater infrastructure assessment, and cost-effective solutions for municipal inspection services and collection system optimization.
InfoSense Team
on
September 11, 2025
Reached 500 Million feet (150 Million meters) of pipe inspected by over 2000 utilities. Control box cushions released.